Laserfiche WebLink
Hall Irwin Const <br />c <br />HALL-1 R IY 1 N, <br />CONSTftOCiION <br />[D <br />V ~.~. t <br />\• af.~V.,w~a <br />i <br />GENERALCONTRACTORS: <br />.Pipelines <br />.. .Utilities <br />ID_~70-352-6284 FEB 06'98 1334 No.032 P.02 <br />QUOTATION and CONTRACT <br />TO: 11.I.B.E. LI.C DATE February 4, 1998 <br />111 King Avenue Fi[I=[HENCE: Pnge 1 of 1 <br />p.0. Tiox 487 <br />lohnsmvm,CO 80534 <br />C;ompletc Slurry Wall Approximately 12,875 LF, Approximately <br />38' lleep in Brighton, Colorado <br />We oiler for your consideration the following proposal: which rf accepted shall constitute a bintling conirRCl betwoen <br />Hall•Irwin Constructioh Co. ancf rho party or parties nnuied abuvc. <br />ITEM OESCRiPT10N UNIT QlIANTITY UNIT BID TOTAL, <br />I Mobilization & Set Up LS 1 $ 21,373,00 S 21,375,00 <br />2 Excavation CY 72777 S 1.67 E ]21,337.39 <br />3 Rock l;xcavatioo CY 5093 E 4.72 5 24,048.40 <br />4 Mixing of Slurry CY 3287 $ 37.50 S 123,262.50 <br />i.5 Mixing ufC.lay Plug Material C'Y 78250 $ 0.23 $ 19,562.50 <br />6 Beckfill CY "78350 $ 1.7,5 S 137,112.50 <br />7 Clem Up & llemobilize LS 1 S 3,000.00 S 5,000.00 <br />R Te<ting & Quality Couuol I.S 1 S 12,000.00 $ 12,000.00 <br />c <br />TOl'AL Bll) 5463.898.49 <br />