Laserfiche WebLink
~ ~ • MINED III IIIIIIIIIIIII III iTIONAI• <br />B99 <br />for limited impact and select regular mine applications <br />1, Name of Company/Mine• Cecil 11-34-49 <br />2. Name/Address/Phone of Contact Person: Washington County, Colorado, Washington <br />County Courthouse, Akron, Colorado 80720 (303) 345-2701 <br />Washington County, Colorado <br />3. Location of Mine: SW% of the NE',, of the NWZ of Sec. 11, T3S, R49W of the 6th P.M. <br />(County, Township, Range, Section to nearest quarter quarter; Exhibit A-:fLR app1.) <br />4. Nearest Town/General Location: 1 mile East, 4 miles North, Cope, Colorado <br />5. Land Ownership (Circle) 1. Private 2. BLM 3. USFS 4. Other <br />6. Present Land Use: Agricultural <br />7. Proposed Final Land Use: Agricultural <br />8. Type of Operation: 1 Surface 2. Underground <br />9. Minerals being mined: Gravel <br />10. Number and Description of Surface Acres Disturbed by Mining/not including roads <br />(Exhibit D-MLR): _ <br />11. Miles of roads to be constructed: <br />12. Life of Mine (years): <br />13. Description of Operation and Reclamation -- Additional sheets may be attached <br />(Exhibits B & E-MLR) <br />Mining Plan: Topsoil of about 12" will be removed and stockpiled on West Part of <br />track. Overburden of about 27" will be removed and stockpiled. Stockpile slopes will <br />be generally about 3:1 which is three to one on side and 4:1 on end. Removal will begin <br />at about the middle of the tract and proceed in an easterly direction. Material will <br />be removed by front end loader, Mining of gravel will be performed to the underlying <br />shell layer, a total depth of about 12 feet. Front end loaders will load gravel into <br />trucks for hauling away of the gravel. A screeing plant will not be used, An estimated <br />two acres will be mined per calendar year for a total of about 40 cyds/year. <br />Reclamation Plan: Following mining banks will be sloped to not steeper than 5:1 <br />slopes. Overburden will be spread over the site maintaining the 5:1 or flatter slopes. <br />Topsoil will be replaced to a depth of 8" compacted and seeded to cover crop of forage <br />sorghum in Spring or early Summer, Forage sorghum at seeding rate of 8" pls per acre <br />will be drilled. Late Fall or early Spring, seeding of following mixture_will be seeded <br />using a suitable drill. (See attached Sheet) <br />14 <br />15, <br />Please enclose Maps of Project Operation, Disturbance Areas and Reclamation (Exhibit <br />C.) Thls will expedite processing. Your cooperation is appreciated. <br />Prepared by: ~ _ ,:~. ., Date: ?,1d)83 <br />-~~ <br />Paee l of 2 <br />