Laserfiche WebLink
(Continued) <br /> Attachment No. <br /> 13-12 Pit Slope Stability Analysis <br /> LIST OF EXHIBITS <br /> Exhibit No. <br /> 13-1 Facilities Map <br /> 13-2 Surface Hydrology <br /> 13-2A Eliminated <br /> 13-3 Surface Water Control Plan -Tie-Across Haul Road <br /> 13-4 Watershed Boundary Partial <br /> 13-5 Proposed Sedimentation Pond 005 <br /> 13-SA Pond 005 As-Built <br /> 13-6 Pond 006 Phase II As-Built <br /> 13-6A Pond 006 Phase IV Subwatershed Map <br /> 13-66 Pond 006 Phase IV Design <br /> 13-6C Pond 006 Phase IV Pre-Settling Basin Design <br /> 13-6D Pond 006 Phase V Subwatershed Map <br /> 13-7 Proposed Sedimentation Pond 009 <br /> 13-7A Sedimentation Pond 009 As-Built <br /> 13-8 Proposed Sedimentation Pond 015 (2 sheets) <br />• 13-8A Proposed Sedimentation Pond 016 (2 sheets) <br /> 13-86 Proposed Sedimentation Pond 017 (2 sheets) <br /> 13-8PP Topsoil Stockpile PP Sumps PP-S1 and PP-S2 (As-Built) <br /> 13-8QQ Topsoil Stockpile QQ Sump QQ-S1 (As-Built) <br /> 13-SRR Topsoil Stockpile RR Sump RR-S1 (As-Built) <br /> 13-9 Pond 15 As-Built <br /> 13-9A Pond 16 As-Built <br /> 13-96 Pond 016 Design Revision <br /> 13-9C Pond 016A (As-Built) <br /> 13-9D Pond 017 (As Built) <br /> 13-10 Typical Road Details <br /> 13-11.1-11.8 Tie-Across Haul Road (As-Built) <br /> 13-12.1-12.4 Mine Entrance Haul Road (As-Built) <br /> 13-13.1-13.5 Haul Road A (As-Built) <br /> 13-14.1-14.3 Haul Road B <br /> 13-15.1-15.2 Haul Road C <br /> 13-16.1-16.2 Reserved <br /> 13-17.1 Reserved <br /> 13-18.1A Haul Road F (As-Built) <br /> 13-19.1A-19.4A Haul Road G (As-Built) <br /> 13-20.1A Haul Road H (As-Built) <br /> PR-O5 iii <br />Revised 01/06 <br />