Laserfiche WebLink
described above. The 3:1 slope along the north side of the property will be established <br />as the excavation is being made. <br />There will be no offices; shop; maintenance, or plant buildings; processing buildings; <br />processing facilities or any underground openings on the site. <br />f See Sheets 1-4 for a detailed, scaled site grading and reclamation plan which <br />shows existing features as well as existing and proposed contours. <br />g A 40' wide haul road will be constructed across the existing drainage. An <br />addendum to the City's Corps of Engineers 404 permit has been obtained to make this <br />crossing. A temporary 48" storm sewer culvert was installed in the drainage channel. <br />This pipe is sufficient to carry a 10-year frequency storm. The pipe crossing was <br />bedded on a synthetic fabric material in order to make the removal of the pipe easier <br />while protecting the wetlands area. A State Stormwater Permit has been acquired for <br />this site. The road will be used during the mining and hauling of the gravel materials. <br />This road will also be used during the reclamation of the west side of the operation. <br />Upon completion of the west side reclamation, this road will be removed and reclaimed. <br />The mining operation on the west side should be completed by the summer of 2007 <br />h The only water used for the mining operation will be for dust control on the haul <br />road. This water will be obtained for other locations out side of the mining boundaries. <br />i Seep water was encountered on the east side. It is from an artesian well located <br />at the south east corner of the site. The water is seeping along the gravel and <br />claystone layer. This water will be directed to the wetland area located on the south <br />side of the operation. The wetlands area is feed from the well water also. No additional <br />water will be added to the wetlands area. <br />j The mining operation will not impact any existing water rights. A stormwater <br />management plan has been developed for this site and a State Stormwater Permit has <br />been acquired. Silt fence has been installed as a part of the Stormwater management <br />plan prepared for this site. <br />k There will not be refuse and acid or toxic materials generated or handled in this <br />mining operation. <br />I Reclamation activities will be stated as soon as the mining operations are <br />completed in the summer of 2007. Reclamation activates and storm water <br />management practices will prevent off site damage and stabilize the site for future land <br />use. <br />m No on site processing of the mined materials will be done. <br />2529 HIGH COUNTRY COURT,GRANDJUNCTION, C081501 P[970]2564177 F[970]2564014 riversidenkwv(a~zicitv.ore <br />