Laserfiche WebLink
a~ <br />TABLE OF CONTENTS <br />4.0 OPERATION AND RECLAMATION PI,.1N5 <br />4.1 Objectives and Background . <br />4.2 General Operation Plan - Life of Operations . <br />4.2.1 Production Methods and Equipment . <br />4.2.1.1 Production Methods <br />4.2.1.2 Equipment . <br />4.2.1.2.1 Hy~9raulic Monitor <br />4.2.1.2.2 Feeder-Breaker . <br />4.2.1.2.3 Development Machines . <br />4.2.1.2.4 Ma~.erials and Personnel <br />Transportation . <br />4.2.1.2.5 Mofiitor Water System . <br />4.2.1.2.6 Fl~.ime Water System . <br />4.2.1.2.7 Sl~irry Pumping System <br />4.2.2 Conservation of Coal . <br />4.2.3 Operation Descri~~tion - 5-Year Permit <br />Period <br />4.2.4 Roads <br />4.2.4.1 Access Roac] . <br />4.2.5 Cut and Fill Vo1Lm~e~ . <br />4.2.6 Signs and Marker:~ <br />4.3 Operation Plan - Permit Area <br />4.3.1 Production Methoc.9s and Equipment . <br />4.3.2 Operation Descri~~t:ion <br />• 4.3.2.1 Permit: Disturbed, and Affected <br />Acreages <br />4.3.2.2 Personnel Requirements <br />4.3.2.3 Power Requirements <br />4.3.3 Surface Facilities <br />4.3.3.1 Primary I'aicilities <br />4.3.3.1.1 Pu_~.iping and Sizing . <br />4.3.3.1.2 Crusher <br />4.3.3.1.3 Coal Washing Plant . <br />4.3.3.1.4 Coil Storage . <br />4.3.3.1.5 Loadout Facility . <br />4.3.3.2 Auxiliary Facilities <br />4.3.3.2.1 Offices <br />4.3.3.2.2 Chzingehouse <br />4.3.3.2.3 Warehouse <br />4.3.3.2.4 Sh~,ps <br />4.3.3.2.5 Eicnctrical Distribution <br />Center <br />4.3.3.2.6 W:Zi:er and Sewage Treatment . <br />4.3.3.3 Water System <br />4.3.3.4 Construction of Surface Facilities <br />4.3.3.4.1 Prc:paration Plant <br />4.3.3.4.2 Th.'.ckener <br />4.3.3.4.3 Sl.irry Tank <br />4.3.3.4.4 Cori]. Storage <br />4.3.3.4.5 Co:ix'se Refuse (Temporary <br />1 <br />1 <br />2 <br />3 <br />3 <br />5 <br />5 <br />6 <br />6 <br />6 <br />7 <br />8 <br />8 <br />8 <br />9 <br />10 <br />10 <br />11 <br />12 <br />13 <br />13 <br />15 <br />20 <br />21 <br />21 <br />21 <br />22 <br />22 <br />25 <br />25 <br />26 <br />26 <br />27 <br />28 <br />28 <br />28 <br />28 <br />29 <br />29 <br />29 <br />34 <br />34 <br />34 <br />35 <br />35 <br />NCIG - Coal Ridge ~1 •S-i MJG/1000/8-20-94 <br />