POND 016A <br />AS-BUILT REPORT <br />TABLE OF CONTENTS <br />I • <br />Page <br />Introduction 13-SF-E1 <br />Embankment and Excavation 13-SF-F.1 <br />Design Analysis 13-SF-F.1 <br />Construction Summary 13-SF-F.2 <br />Addendum 13-SF-G - 10-Year, 24-Hour SEDCAD Demonstration <br />Addendum 13-SF-H - 25-Year, 24-Hour SEDCAD Demonstration <br />Addendum 13-SF-I - Emergency Spillway Outfall Channel <br />Addendum 13-SF-J - Pond 016A Compaction Testing Results <br />Addendum 13-SF-K - Pond 016A Final Geotechnical Report and Summary <br />TR-56 <br />TOC-i <br />Revised 09/06 <br />