Laserfiche WebLink
Co!o. Deb[. Qi •: ~I L•i .i.:.c::;,,;:fCr <br />• III IIIIIIIIIIIIIIII ~ <br />~'~ <br />R O C K C O M PA, 11! V <br />QUARRY: <br />P.O. Box 625 <br />Lyons, Colorado 90540 <br />303-043.3490 <br />OFFICE: <br />313 South Phillips <br />Sioux Falls, S. O, 57102 <br />605-334-5000 <br />Peter V. O'Connor <br />Mine Land Reclamation Division <br />1313 Sherman Street Room 423 <br />Denver, Colorado 80203 <br />Dear Mr. O'Connor: <br />Regarding our meeting on May 16, 1983 I would like to confirm our <br />discussions as follows: <br />A. Andesite Rock Company recognizes the fact that we have mined <br />in areas A and B which is out of proposed mining plan. Area <br />C, which was dozed out for a test area is also out of our <br />permitted area. (See enclosed map) It is our intention to <br />address these area's with a new mining and reclamation <br />amendment within 90 days. <br />B. Andesite Rock Company desires to lower the existing quarry <br />floor and reclaim it to the current mining permit floor ele- <br />vation. The backfill for this operation will consist of <br />strippings and waste from the mining area. It is my under- <br />standing that we will be required to submit a technical <br />revision as it does not affect any additional land or our <br />final reclamation plan. We expect to submit this revision <br />within 90 days. <br />Than you for taking the time to meet with me, and if you should <br />hav questions p ease do not hesitate to call me. <br />Dennis Staebell <br />Vice President <br />Enclosure <br />Certified Letter P 457 026 002 <br />