My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106278
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:02 PM
Creation date
11/24/2007 1:32:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003001
IBM Index Class Name
Permit File
Doc Date
1/2/2003
Doc Name
Permit Application
From
Hall-Irwin Corporation
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Schedule <br />Phase Time Frame for <br />Minim and Reclamation <br />Phase 1 2 years <br />Phase 2 3 years <br />Phase 3 5 years <br />Phase 4 5 years <br />Phase 5 4 years <br />Phase 6 4 years <br />Upon final mining of the last Phase, 6 months to reclaim the entire site and 1.5 <br />years to establish vegetation. <br />2. A description of the size and location of each area to be reclaimed <br />during each phase; and <br />Refer to the Reclamation Plan Map in Exhibit F for the size and location of each <br />phase. <br />3. An outline of the sequence in which each stage or phase of <br />reclamation will be carried out. <br />The sequence of reclamation will include regrading of mined sites, replacement of <br />6" of topsoil and seeding during the appropriate season to assure adequate <br />moisture for germination and weed control and to assure that grasses can establish. <br />Additional plantings will be installed during final reclamation. <br />Hall-Irwin Corporation Page 20 of 35 <br />MLRB 112 Peanit Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.