Laserfiche WebLink
The post-mining land use will be rangeland. Adjacent land use is rangeland. <br />Reclamation Process; <br />After topsoil and overburden is removed and segregated into appropriate stockpiles <br />using a loader, mining will begin. RedamaYion will be concurrent with mining in that <br />reclamation will occur on mined acres as mining proceeds across the 40-acre phase. <br />Reclamation will be an ongoing process throughout the life of the mine. Slopes will <br />be constructed 3:1 or gentler and will blend into natural contours of unmined slopes. <br />Fines and overburden will be used to level the active mining floor and secure slopes. <br />Finished grades will blend with surrounding topography. <br />At least six inches of surface material, topsoil, or a 50% mix of fines will be <br />redistributed over the affected area. A# disturbed ~surfates will be sloped to a 3:1 <br />grade or gentler. <br />The applicant will bond for 40 acres at a time. The applicant will mark 40-acre <br />phases by stakes, perms or otfier visible markers. <br />Stockpiles will be seeded if the life expectancy is anticipated to be greater than one <br />year. This will be assessed by the duration of-the ~oject for which rr+ater+al is t+eirog <br />processed. Overburden stockpiles will be used during reclamation of the area of <br />concern. <br />Interior haul roads are existing gravel roads that will not be reclaimed in order to <br />service the ongoing ranchingac#~vities. <br />The water storage tank will remain following the operation. The tank will be <br />converted to a stock tank forttie ranzfi activities. <br />Topsoil Preservation; <br />Throughout the mining area, salvageable topsoil or surface material will be stripped <br />with a loader and stockpiled: °if a-stockpile's life expectancyis greatertfian one <br />year, it will be seeded with the reclamation seed mix. Slopes on the stockpiles will <br />be 2:1 and seeded by broadcasting. Topsoil staticpites-wHl'be signed-astopsoit on <br />location. <br />Regrading and Shaoina: <br />Prior to surface material replacement, a loader or blade will smooth the affected area <br />and reshape the peflmeter slopes.°•Siopes will be3:i°vr-gentler orbiended taitfi tfie <br />unmined, natural contours. All disturbed areas will be reworked to blend with the <br />surrounding landscape2xcepttheftavtroadandtfiewatertank. Aminnnumrof 18 <br />inches of subsoil material will be distributed onto the site, Back slopes will be <br />scarified to a depth 9f fi inches. <br />Topsoil Replacement: <br />Topsoil or a 50% mixture of topsoil and overburden, will be redistributed over the <br />affected area with a toaderandtifadetoabepthvfatieast5inches:-°i3uetvrthe <br />loose, gravelly nature of the surface material, compacting may be necessary. <br />Compaction will occurentN yz ineh foot print-fema+rjs•+rr~prifltecl an the prepared <br />surface. <br />