Laserfiche WebLink
UPLAND GRAVEL PIT NO.3 <br />EXHIBIT G <br />Water Information <br />No ground water or surface water is present atthe site which needs controlled or de-watered. <br />Storm water generated on the affected area will be retained on site by dikes. . <br />Domestic water supplied by Clifton Water District shall be piped to the site from Springfield <br />Ranch property for use in dust control during crushing and processing. <br />