Upland Gravel has formulated a timetable for this site based on the removal of <br />material at the rate of 40 K-60 K ton annually. Timetables are subject to changes <br />dictated by market demand for construction and landscape materials. The <br />timetable is prepared in two year phases for mining and reclamation activities for <br />the life of the reserves. <br />Phase 1 Reclamation 12006-20071 <br />Block 1 Remove topsoil and gravel for construction of 3000 feet of haul road between Block 1 <br /> and the end of paved road in Springfield Estates. <br /> Construct processing and stockpile area. Set up crusher and equipment and begin <br /> gravel processing. <br /> Fall 2007 - Re-vegetate fill slopes. <br />Block 2 Fall 2006 -Remove topsoil and distribute to berms on Block 1. <br /> Gravel extraction <br />Block 3 Unaffected. <br />thN <br />Block 22 <br />Phase 2 Mining (2008-2009) <br />Block 1 Gravel processing and storage. <br /> Fall 2008 - Re-vegetate topsoil berms from Block 2 <br />Block 2 Re-vegetate topsoil from Block 3. <br />Block 3 Fall 2008 -Remove topsoil and distribute on mined out areas of Block 2. <br /> Extract gravel for processing on Block 1. <br />Block 4 Fall-Winter 2009 -Remove topsoil and distribute to mined out areas of Block 3. <br />Block 5 Unaffected. <br />thN <br />Block 22 <br />Phase 3 Reclamation 12010-2011) <br />Block 1 Gravel processing and storage. <br />Block 2 Idle - Re-vegetating topsoil. <br />Block 3 Idle - Re-vegetating topsoil from Block 4. <br />Block 4 Gravel extraction. <br /> Fall 2010 - Re-vegetate topsoil from Block 5. <br />Block 5 Remove topsoil and distribute on Block 4. <br /> Gravel extraction. <br />Block B Fall 2011 -Remove topsoil and distribute on Block 5. <br /> Gravel extrac0on <br />Block 7 Unaffected. <br />thN <br />Block 22 <br />2 <br />