Laserfiche WebLink
• Other Inspections -Date 10/14/94. Findings and action taken: <br />Erosional, structural and appurtenant structures were monitored. Inadequate vegetation was <br />observed on the downstream slope of the embankment. The embanlartent was reseeded. A <br />burrow on the embanlonent was filled in. Cracks approximately 1/2-inch wide were observed <br />on the crest of the downstream face of the spillway to the north abutment. The cracks were <br />filled and tamped. Stakes were used to mark the cracks to monitor future activities. A blind <br />was constructed of riprap from the emereency spillway. The blind was taken down and returned <br />to the emereency spillway. No discharge occurred during the quarter. <br /> <br />• <br />