My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106146
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:56 PM
Creation date
11/24/2007 1:20:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
TAB 17 RECLAMATION SCHEDULE
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 17-2 <br />Summary of Reclamation Scheduling <br />Action Taken <br />1. Bond procurement ~. <br />2. Sediment control <br />3. iopso(l remove( and storage <br />4. Commence operation <br />5. Removal of buildings, railspur, <br />facilities, ate. <br />b. Baekfilling and grading (Phase I bond <br />release is ready for implementation) <br />7. Topsoil redistribution (traffic areas.. <br />and other compacted areas will be <br />ripped prior to topsoiling) <br />8. Soil testing and amendment application <br />9. Seeding (Phase 11 bond release is <br />ready for implementation) <br />10. Rill and gully monitoring, repair, <br />maintenance, normal husbandry activities <br />11. Revegetation monitoring <br />12. Revegetation success monitoring <br />13. Phase II bond release is ready for <br />implementation <br />Time Period <br />Prior to permit issuance <br />Previously installed <br />Previously completed; prior to final <br />beckfilling and grading <br />June 1993 (approximate) <br />After final cessation of operations <br />(Regulatory Authority to be notified) <br />Concurrent with facility removal <br />After final beckfilling and <br />grading is completed <br />Prior to seedbed preparation for <br />phosphorus and after second or <br />third growing season for nitrogen <br />First appropriate planting season <br />after topsoil replacement <br />Years 1 through 8 after last <br />augmented seeding. <br />Periodically (years 1 through 8 after <br />last year of augmented seeding <br />Year 9 and 10 after last year of <br />augmented seeding <br />After all reclaimed disturbances have <br />been observed for a minimum of 10 years <br />b Revised 03/01/93 <br />• <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.