My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106146
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:56 PM
Creation date
11/24/2007 1:20:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
TAB 17 RECLAMATION SCHEDULE
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TAB 17 <br />RECLAMATION SCHEDULE <br />Introduction <br />Teb 17 contains the timetable for each major phase of the reclamation plan and projected <br />reclamation schedules for the Hayden Gulch loedout facility permit area. Additional <br />information regarding the timing of rectamati on activities may be found in the tabs which <br />discuss the various components of the reclamation plan. For example, seeding periods are <br />spetifitally discussed in Teb 20, Revegetation Plan. <br />The current limits of disturbance within the permit area are shown on Exhibit 17-1. No <br />additional land disturbances associated with operation of the loedout facility are <br />contemplated at this time. However, an additional 8.4 acres may be disturbed during <br />reclamation to accommodate grading activities. Operations ere expected to commence June, <br />7993, end continue indefinitely. Because of the potential for new coal markets in the <br />future, the exact closing date end dates of final reclamation can not be predicted. <br />• However, Hayden Gulch Terminal, inc. will complete ell reclamation activities in accordance <br />with the Regulations of the Colorado Mined Lend Reclamation Board for Coal Mining in a <br />contemporaneous manner following permanent closure of the facility. <br />timing of Reclamation Activities <br />A generalized timetable of reclamation activities is shown in Figure 17-t. The timetable <br />depicts the sequence and timing of each major phase of reclamation. Precise specification <br />of the timing of each reclamation phase is not possible for the following reasons: t) <br />variables such ae manpower and equipment avai lebi lity, weather conditions end season, and <br />the availability of materials end supplies effect the progress of futilities removal, <br />grading, topsoiling, end seeding in the disturbance area; end 2) initiation of reclamation <br />activities is dependent upon when during the year operations ere terminated, end timing of <br />subsequent activities in the reclamation process ere effected by when initial grading end <br />facilities removal is completed. <br />Site clearing end topsoil salvage operations have been completed (the coal handling <br />• facilities were constructed from Fall 7977 to 1979); however, additional topsoil selvage <br />will be required prior to final bec kfilling end grading as described in Teb 19. No <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.