My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106132
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:55 PM
Creation date
11/24/2007 1:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998034
IBM Index Class Name
Permit File
Doc Date
4/16/1998
Doc Name
Administrative Review Letter
From
DMG
To
TUTTLE APPLEGATE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 <br />Mr. Gary Tuttle <br />April 16, 1998 <br />only post notice (sign) at the location of the proposed access to the site. After having posted such <br />notice (sign), failure by an Applicant to maintain such notice shall not constitute just cause to deny <br />approval of the application. At the time the application is filed with the Office, the Applicant shall <br />provide a signed affidavit that such notice (sign) was posted according to the provisions of this <br />Rule. <br />A sample notice is enclosed for your use. <br />Your application will not be considered filed until the information listed above is received and found <br />sufficient to begin our review. A decision date will be established 30 days from the date of receipt of all <br />of the requested information. Additionally, if you have already published notice you will need to republish <br />notice, after [he Division considers the application submitted. Republication must occur once within ten <br />(10) days of the submittal date. We will notify you when you should initiate republication of your notice. <br />The final date for receiving comments is ten (10) days after the date of publication or the next regulaz <br />business day. <br />This letter shall not be construed to mean that there aze no other technical deficiencies in your application. <br />The Division will review your application to determine whether it is adequate to meet the requirements <br />of the Act after submittal of all required items. <br />Sincerely, <br />Suzi M.Ericksen <br />Program Assistant <br />Enclosures <br />cc: M. Joe Docheff, III, Mountain Park Concrete, Inc., w/enclosures <br />M:\OSS\PMM\TEMP\APO'_00)J SME <br />
The URL can be used to link to this page
Your browser does not support the video tag.