Laserfiche WebLink
Page z of 3 4 <br />t <br />ASSESSMENT CONFERENCE REPORT <br />(continued) <br />1. Notice of Violation/Cessation Order No. 79-V-5-~A <br />3 ' <br />Violation ~ of <br />~ allure to and maintain a railroad siding and <br />(a) Nature of violation loadout facility to control dimunition or degradation <br />o wa er qua y an quan v an o nt additionaj <br />(b) Date of termination contributions of suspended solids to streamflow. <br />Proposed Conference <br />(2) Conference Result Assessment Assessment <br />(a) Iii story/Prey. Vio. (30) None <br />(b) Seriousness (30) <br />(1) Probability of <br />occurrence (15) ~5 ~5 <br />Extent of <br />• Damage (15) 9 9 <br />(2) Obstr. to Enforcement (15) <br />(c) Negligence (25) 21 21 <br />(d) Good Faith (-10) -~~ <br />Total I+5 35 <br />3. "arrative: <br />(Brief explanation of reasons for any changes made in assignment of <br />points and any additional information that was presented at the <br />conference.) <br />The company commenced the remedial actions prescribed by the inspector <br />immediately. This activity was completed as nuickly as the construction <br />could be done.. Additionally, the company has gone beyond the measures <br />prescribed by the inspector. A much more elaborate sediment control <br />scheme has been designed, approved, and constructed. For this reason, an <br />award of -10 has been made in the category o.f good faith. <br /> <br />