Laserfiche WebLink
11. Because the new evidence presents a persuasive case that the Boazd's <br />October order should be modified to allow mining under the restrictions <br />proposed by the Petitioner and recornmended by the Division staff, it is <br />appropriate that the Boazd modify its October order pursuant to <br />Construction Materials Rule 2.9. Specifically, it is appropriate that the <br />Boazd modify Condition #2 to allow mining to a depth of 13 feet during <br />Phase I of operations, with such operations to be suspended if water levels <br />rise to within 25 feet of the surface during mining. <br />ORDER <br />Based on the foregoing facts and conclusions of law, the Boazd orders that the <br />Petition for Reconsideration is hereby granted and that Condition #2 in Haldorson and <br />Sons, Inc.'s Section 112 Reclamation Permit is hereby modified to read as follows: <br />2. The operator shall not excavate beyond a maximum depth of 13 feet below <br />existing surface elevations during Phase I until one full year of <br />groundwater monitoring data has been submitted, reviewed and approved <br />by the Division. Should groundwater rise to a depth of 25 feet below the <br />original ground surface, all excavation shall cease in that area until the <br />water table has receded below the 25-foot depth-to-water mark. Under no <br />circumstances is groundwater to be exposed for any reason without first <br />obtaining the proper local, state and federal permits that may be required. <br />Groundwater monitors shall be monitored weekly, on the same day for one <br />(1) full year for depth of water. All groundwater data shall be logged and <br />