4.12 EXHIBIT L -Reclamation Cos <br />The pernrit boundary encompasses 160 acres of which 71.8 acres will be disturbed by the three <br />phases of mining. Of the 71.8 acres, 68.2 acres will be disturbed and reclaimed and 1.6 acres will <br />be disturbed and remain as an un-reclaimed access road on the owner's property. If topsoil is <br />spread on the 68.2 acres at a depth of 3 inches, 27,507 cubic yards of topsoil is required. The <br />Applicant/Operator feels that 3 inches is the maximum amount of material available for placement <br />during reclamation. Actual material available for placement may be considerably less. <br />Reclamation Estimate <br />Reclamation of the permit azea will be contemporaneous with [he excavation of the gravel pit and <br />at no time will more than 20 acres of the permit area be open and un-reclaimed. Phase I of the <br />pernrit area will be reclaimed before Phase II is completely opened. <br />The ApplicanVOperator asserts that since at no time will more than 20 acres of the permit azea <br />will be open and un-reclaimed, 20 acres is appropriate as a base for reclamation. <br />Therefore, the reclamation cost estimate will be based on the placement of 8,067 cubic yards of <br />cover material (20 acres at 3 inches depth) on the disturbed areas of the gravel pi[. <br />Reclamation Cost Estimate: <br />Spread & Place TopsoiUGrowth Medium (8,067 cu.yds. x $1.50) $12,100 <br />Seed & Fertilize (20.0 acres x $120) 2 <br />Total Estimate for Bond $14,500 <br />L-1 <br />