My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105977
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:47 PM
Creation date
11/24/2007 1:03:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003058
IBM Index Class Name
Permit File
Doc Date
7/23/2003
Doc Name
Incomplete
From
DMG
To
Glenn E. Sessions & Sons Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />(3) All items referenced in the Reclamation Plan must be included in the cost calculation. These <br />items in addition to earthwork, such as detoxification, building demolition, fencing, monitoring well <br />sealing or stream channel reconstruction must also be included in the reclamation cost estimate. <br />(4) After the direct vests noted above have been estimated, the Office may add up to an additional <br />maximum eighteen and one-half (18.5%) percent of that total, which includes private contract, typical <br />overhead costs. This additional cost is required to cover induect costs that an independerrt contractor <br />would incur when performing reclamation of the site. Five (5%) percent additional cost shall be added to <br />cover Office administration cost in the event of bond forfeiture and permit revocation. <br />A copy of Page 4 and 5 and Exhibit D (Reclamation Cost Estimate) must be placed at the Jackson County Clerk <br />and Recorder with the Application that was placed there for public review. Please submit a receipt for filing with <br />the Clerk and Recorder. <br />Your application will not be considered filed until the information listed above is received and found sufficient to <br />begin our review. A decision date will be established 30 days from the date of receipt of all of the requested <br />information. Additionally, if you have akeady published notice you will need to republish notice, after the <br />Division considers the application submitted. Republication must occur once within ten (10) days of the submittal <br />date. We will notify you when you should initiate republication of your notice. The final date for receiving <br />comments is ten (10) days after the date of publication or the next regulaz business day. <br />You have sixty (60) days from the above date to submit all necessary documents that the Office needs for an <br />application to be considered filed. If, at the end of the sixty day period, the applicarion has not been determined to <br />be filed with the Office, the Office shall deny the application and terminate the application file. <br />This letter shall not be construed to mean that there are no other technical deficiencies in your application. The <br />Division will review your application to determine whether it is adequate to meet the requirements of the Act after <br />submittal of all required items. <br />Singce~r-e~ly~,~-~ <br />Barbara D. Chiappone <br />Minerals Division Program Assistant II <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.