Laserfiche WebLink
~~~ ~ ~ ~ IIIIIIIIIIIIIIIIIII <br />c/ ~ EXHIDIT H <br />Reclamation Costs <br />Airport ~t <br />Activity Equipment Used Time (man hrs.) at Sub-total <br />1. Finish grading and AC-16 crawler-dozer 16 hrs. @ $30.00 5480.00 <br />minor slope work. or per hour <br />D-6 crawler-dozer <br />Total Reclamation Cost $ 480.00 <br />These Reclamation Costs do not reflect the sloping and grading that is described <br />as part of the mining plan itself. The method of excavation proposed will in- <br />crease the costs of the op :ration due to added equipment time. These costs will <br />be twenty-five dollars ($25.00) per hour of slope work. These added costs will <br />amount to approximately two thousand dollars ($2,000.00) over the life of the <br />operation. <br /> <br />