My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105820
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:40 PM
Creation date
11/24/2007 12:48:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003016
IBM Index Class Name
Permit File
Doc Date
2/28/2003
Doc Name
Permit Application
From
SW Meadow LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Banks and Gesso, LLC <br />EXHIBIT E -RECLAMATION PLAN <br />Mine Area 1 <br />The primary post-mining land use for Mine Area 1 will be a lined water storage reservoir. <br />Revegetation will be accomplished using native seed mixes. Slope reclamation and <br />revegetation will be on-going as material is excavated. Following mining of the area <br />beneath the plants, final seeding and grading of this area will occur. Final reclamation <br />will be completed within 1 year of the end of mining. <br />Mine Area 2 <br />The primary post-mining land use for Mine Area 2 will be wildlife habitat. Mine Area 2 <br />will be converted into an unlined pond with approximate 5:1 side slopes, for easy <br />accessibility by wildlife. Shorelines created during mining will be undulating to give a <br />more natural appearance. <br />The Reclamation Plan assumes the cost for restoration of the mining areas as a lined <br />water storage reservoir and a wildlife habitat pond. Refer to Exhibit F -Reclamation <br />Plan Map for further details <br />Reclamation Process <br />Land disturbance in the permit area will begin with grubbing of vegetation and removal <br />and stockpiling of overburden prior to mining (approximately 233,929 yd3 from both mine <br />areas). Stockpiled overburden will be used to backfill pit edges to the reclaimed slopes. <br />The total affected areas are shown on Exhibit F. <br />Topsoil Segreoation. Preservation and Replacement <br />Temporary topsoil berms will provide visual screening over the life of the mine and will <br />be strategically located for easy access during reclamation. If topsoil stockpiles remain <br />longer than one growing season, they will be revegetated. Watering of stockpiles will <br />occur as needed for dust control. <br />Final Grades <br />Mine Area 1 pit edges will be backfilled at a 3:1/2:1 slope. The slopes will be 3:1 from <br />the top of the mine high wall to a point approximately 10 ft below expected water levels, <br />Heit Sand and Gravel Mine 02044 <br />SW Meadow, LLC February 2003 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.