Laserfiche WebLink
~. <br />MINED LAND RECD,,. <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO E10203 <br />303 666-3567 <br />Fn x: 303 832-6706 <br />August 27, 1990 <br />. ~I I I I~' I~ ~ II I~~~ II~ <br />Mr. Jo1tn f. Carder <br />Carder, Inc. <br />P.O. Box 727 <br />Lamar, Colorado 81052 <br />Re: M-90-087, Earl/Hoffman/Reyher, Permit Issuance <br />Dear Mr, Carder: <br />~y <br />pF COQ <br />A~ 7p <br />~`~8~18 <br />. . <br />~ /996 ~ <br />Ray Romer, <br />Gavemor <br />Freo R. Banta, <br />Drvision Dnenor <br />On August 22, 1990, the Mined Land Reclamation Division found Carder, Inc, to <br />have satisfied the applicable requirements of C. R. S, 34-32-101 et seq. for <br />obtaining a mining and reclamation permit. Therefore, a permitis~eing <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here area few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with ttte terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />aescribed in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules ano Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendmt:nts, Rule 1,9 to Technical Revisions, ana Rule ],10 to Conversions, <br />3. On your permit anniversary date each year, August 22, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$50.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permit>, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely,; i, i <br />' ~ ~. <br />FRED R.~ BANTAM <br />Director <br />FRB/eke <br />Enclosures <br />8tib2G <br />