Laserfiche WebLink
<br />high flow channel <br />3-4 pins per sq. yd. <br />low flow channel <br />2-3 pins per sq. yd. <br />Always install two rows of pins <br />spaced 1.5 x 1.5 feet apart at all <br />roll splice locations. <br />4. <br />Anchoring Devices: Typically 11-8 <br />gauge of a 8" x 1" x 6" metal pins are ~ <br />used. When surface soil conditions are ~~~~~ <br />loose, use 8" x 1" x 8" or 12" x 1.5" x 12" <br />metal pins, 8" - 18" pins with 1.5" diameter washer, or 12-30" <br />'/:' diameter. Drive pins or pins flush with the ground surface <br />[NECK SLOT AT 1$' (7.6) INTERVALS <br />(OR pOOBLE ROWOT GINS) <br />J-Shape pins (bent rebar) having a <br />5. Soil Filling: There are two options when installing Enkamat-soil filling or non-soil filling. Soil filling <br />Enkamat accelerates performance because the Enkamat, soil and the new vegetation interact <br />together to resist shear forces when water is flowing though the channel or on top of a slope. If soil <br />filling is utilized spread''/z to'/. inches of fine soil into the mat to comfiletely fill it. <br />A typical condition where non-soil filling is used would be to collect s<;diment when water is flowing <br />through the channel from an up-gradient source. <br />6. Seeding: For non-soil filling applications, broadcast seed or hydrose:ed over the installed Enkamat. <br />Make sure hydromulch occurs after seeding to ensure the seed reaches the topsoil. If soil filling, <br />seed after filling is completed. You may also seed before and after soil filling to create a better <br />established root structure and increase vegetation strength. Check with your local seeding <br />consultant to verify appropriate seed and fertilizer mixture. <br />7. Sod Installation: If covering Enkamat with sod, soil filling is required. Place sod in the direction of <br />water flow. Periodically install a row or two perpendicular to the flow to reduce the possibility of <br />water flowing along the seams of the sod. In most cases, you should pin the sod down to prevent <br />movement. <br />• For technical assistance please contact your drstnbutor or Colbond, lnc., P.O. Box 1057 Enka, NC 28728 <br />Toll Free: 800-36x7391; email: enka-engineered@colbond.com; web:www.i;olbond-usa.com <br />m Colbond Geosynthetics R: 11/01 Printed in the U.S.A <br /> <br /> <br />