Laserfiche WebLink
7-11 Pond Inspection Report Forms • <br />7-11A Sediment Pond Sediment Storage Survey <br />7-12 Postmining Drainage Control <br />EXHIBIT NO. <br />7-1 Oil and Water Well Location Map <br />7-2 Hydrology Monitoring Site Location Map (Revised and Retitled, <br /> 19861 <br />7-2A Piezometric Contour Map of the Wadge and Wolt Creek Coal <br /> Aquifers and Water Table Contour Map of the Spoils <br />7-26 Piezometric Contour Map of the Wadge and Wolf Creek Coal <br /> Aquifers and Water Table Contour Map of the Spoils <br />7-3 Regional Drainage Basin Map <br />7-4 Premining "HYMO" Model <br />7-5 HYMO Model Postmining Reach Map <br />7-6 Seneca II Mine Computer HYMO Routing Flows for 10, 25, <br /> and 100 Year Precipitation Event <br />7-7 Surface Hydrology Map <br />7-8 Wadge Impoundment N002 and Cross-Section <br />7-8A Wadge Impoundment N002 (Proposed Postmine) <br /> <br />7-9 <br />Wadge Impoundment Outlet Details • <br />7-10 N.W. Impoundment and Diversion Ditch <br />7-11 Northwest Impoundment N003 <br />7-11A Northwest Impoundment !1003 (Proposed Postmine) <br />7-12 Pond J7004 <br />7-13 Proposed Pond JJ004 Details <br />7-14 Typical Road and Ditches Details <br />7-15 Surface and Groundwater Rights Plat <br />7-16 Sediment Pond 1!007 <br />7-16A Truck Wash Facilities Layout <br />7-17 Sediment Pond !1008 <br />7-17A Sediment Pond No. 008 IAs-Built) <br />7-176 Sediment Pond No. 008 Proposed <br />7-17C Sediment pond No. 008 As-Buih <br />7-17D Pond 008 Principal Spillway Redesign <br />7-18 Proposed Permanent Impoundment Pecoco <br />7-19 Postmining Drainage Control <br />7-20 Postmining Channel Profiles <br />7-21 Pond 004 Principal Spillway Redesign <br />7-22 Pond 004 & 008 Watershed Boundary <br /> • <br />TR-39 x Revised 06/05 <br />