My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105665
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:34 PM
Creation date
11/24/2007 12:40:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977325
IBM Index Class Name
Permit File
Doc Date
9/30/1977
Doc Name
LIMITED INPACT AND SPECIAL TEN DAY PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TYPE OR PRI?;T CL&9RLY <br />14. Present land use Wildlife Habitat. Clgy Pit <br />(i.e., agricultural, industrial, etc.) <br />15. Proposed future land use Wildlife Habitat <br />(Goal of reclamation) <br />INSTRUCTi0i1S: This application form must be submitted in duplicate and each form must <br />be accompanied by the following information and items. The application <br />will rot be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />EXHIBIT A - Legal Description <br />The legal description must identify the affecte3 land and be wholly adequate for <br />field location of the property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter section. kfi ere applicable, the street address or lot <br />number(s) may be used. <br />EXHIBIT B - Lining Plan <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the moo and should show cohere extraction will begin, which <br />direction it will proceed. <br />EXHIBIT C - Map <br />This map should be as comprehensive as possible in terms of clearly defining <br />the permit boundaries and indicating all roads or stoc!cpile areas to be used in <br />connection with the operation. All immediately adjacent landowners must be shown. <br />The closest quarter- section corner, section line, or any other locateable point <br />should also be shown on the map. <br />EXHIBIT D - Wildlife Water Resources Vegetation and Soils Inforrcaticn <br />Each of the above-mentioned subjects must be addressed as outlined in the <br />applicable Rule, under item number ten (10). <br />EXHIBIT E - Reclamation <br />As with the mining elan, tt:is should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />land affected by each. If possible, the plan should be closely correlated <br />with the map. If not, the narrative must be comprehensive enough to draw an <br />accurate verbal picture of the expected physical appearar_ce of the area after <br />completion of reclamation. <br />EXHIBIT F - Proof of Local Government Approval <br />This must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />E.~LIBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax <br />receipt. In lieu thereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECIAL 10-DAY PER:IITS 02ILY~* <br />EXHIBIT U - Reclamation Costs <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will autonat'_ca11;~ <br />be set. <br />EXHIBIT I - Terms of Governmental Contract <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it Baas required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.