Laserfiche WebLink
• Exhibit D-1 <br />Reclamation plan for: Loukonen Bros Lykins Gulch Quarries <br />110 Permit <br />The plan for all quarries listed in the permit aze to remain open until all <br />usable stone is removed from the quarry sites. <br />At that time the surrounding stock piles of overburden w•iIt be moved to cover <br />the quam~ site in a minimum depth of 4 to 6 inches. The rock and soil will be <br />graded to flow with the surrounding areas. <br />Norih Quarry -Yellow areas on drawing show overburden piles stocked <br />in the quarn~ area; this would be pushed back over the quam~ area in a 4 to 6 inch <br />depth. <br />Estimated reclamation time - 3 days x Crew # 1 .. Cost 54095 <br />South Quam' -Yellow areas on drawing show overburden piles stocked <br />in the quam~ area; this would be pushed back over the quam• area in a 4 to 6 inch <br />depth. <br />Estimated reclamation time - ] days x Crew #] _. Cost $] 365 <br />NOTE: Crew #1 consists of a D7 Cat w,~ripper, a XL 150 Excavator, Dump <br />truck and a two man crew to operate the equipment. <br />RECEIVED <br />VOIf ~ 201110 <br />., alg F, GPOIe~, <br />