Laserfiche WebLink
III IIIIIIIIIIIII III <br />• COLORADO - SENECA ALLUVIAL PROJECT <br />EXPLORATION AND RECLAMATION PLAN <br />Description of Area to Be Explored <br />Exhibit "A" and Exhibit "C" <br />Commencement and Duration of Drilling <br />The drilling will start in November 1987 and it is anticipated that <br />drilling will be completed by November 1988. <br />Method of Exploration and Equipment to be Used <br />Exploration will consist of auger drilling. The equipment used will be <br />one hollow stem auger drill. Other equipment in the field will include <br />two four-wheel drive pickups, and one geophysical logging truck. <br />There will be a total of two well locations to be explored at an average <br />• depth of 50 feet each. The diameter of each hole will be ten inches. See <br />Exhibit "A". <br />Light-Use Roads, Seed Mixtures <br />No light-use roads or other excavations will be constructed for this project. <br />Any drainage structures required shall not affect normal flow or affect fish <br />migration or aquatic habitat and related environmental values. Drainage <br />culverts will be installed where required on streams. <br />Road maintenance shall ensure minimization of erosion. <br />Roads will not be used if climatic conditions are such that usage may cause <br />degradation of water quality. <br />The drill sites will be revegetated according to 4.15.3(1) and (2). <br />• Seeding and planting will be conducted, when necessary, after all drill <br />operations have finished and the areas are scarified, plowed, or ripped. <br />