My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105530
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:28 PM
Creation date
11/24/2007 12:28:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 44 NPDES Permit No. CO-0042161
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page No. 15 <br />Permit No.: CO-0042161 <br />GENERAL MONITORING, SAMPLING AND REPORTING REQUIREMENTS <br />6. Signatory and Certification Requirements <br />(iv) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking <br />elected official, or other duly authorized employee. <br />(b) All reports required by permits, and other information requested by the Division shall be signed by a person as <br />described above or by a duly authorized representative of that person. A person is a duly authorized <br />representative only if: <br />(i) The authorization is made in writing by a person described above; <br />(ii) The authorization specifies either an individual or a position having responsibility for the overall operation <br />of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, <br />superintendent, position of equivalent responsibility, or an individual or position having overall <br />responsibility for environmental matters for the company. (A duly authorized representative may thus be <br />either a named individual or any individual occupying a named position); and, <br />(iii) The written authorization is submitted to the Division. <br />If an authorization as described in this section is no longer accurate because a different individual or position has <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section <br />must be submitted to the Division prior to or together with any reports, information, or applications to be signed by <br />• an authorized representative. <br />The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documents: <br />"1 cenify under penalty of law that this document and all attachments were prepared under my direction or <br />supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the <br />information submitted. Based on my inquiry of the person or persons who manage the system, or those persons <br />directly responsible for gathering the information, the information submitted is to We best of my knowledge and <br />belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations." <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.