Laserfiche WebLink
<br /> <br />Exhibit D -Mining Plan (Rule 6.4.4) <br />7. Please describe the methods of topsoil handling, protection while in stockpile, and any "live handling" <br />that will be performed (immediate placement of stripped soil onto another area). <br />8. Please state how much the pit floor area must grow before portions of it can reasonably be reclaimed. <br />Exhibit E -Reclamation Plan (Rule 6.4.5) <br />9. Your revegetation plan includes a seed mix which includes a rate of "PLS per acre," though that actually <br />refers to seeds per acre, not op unds of seed per acre. Please clarify that your rates refer to "pounds of PLS <br />per acre" in your proposed seed mix. <br />]0. If your final pit slopes are 3:1 but will not be 3:1 during mining, please state what the slopes during <br />mining will be. Also, if final slopes are created by cut and fill, please state what the setback distance will be <br />from the edge of the affected area to allow for equipment maneuvering. <br />Exhibit F -Reclamation Map1Rule 6.4.6) <br />11. Please show the features which will remain after reclamation is completed, such as roads, fences, above- <br />ground facilities and structures. <br />Exhibit J -Wildlife Information (Rule 6 4 10) <br />]2. As we discussed during the inspection, even though the local DOW officer does not consider this <br />operation to present any problem from the standpoint of wildlife, he has not provided you with such an <br />opinion in writing. Our rules require that such a written statement be provided by the applicant. If you <br />cannot obtain one, let me know so that I can attempt to contact him myself. <br />Exhibit K -Climate Information (Rule 6.4 11) <br />13. Please provide a summary of the average monthly temperatures and average monthly amounts of <br />precipitation. <br />Exhibit P -Municipalities Within Two Miles <br />14. Please provide the address and phone number for the governing body of the Town of Del Norte. <br />Exhibit S -Significant Structures (Rule 6 4 19) <br />15. It is recognized that several structures exist on the property line or outside the property, but within 200 <br />feet of the proposed permitted area boundary. You have provided damage agreements for some of them, but <br />not for all. Please either provide additional damage agreements or engineering evaluations for them. <br />16. Do you expect percolation losses from the Rio Grande Canal or seepage into the pit? Please state what <br />the horizontal distance between them is. <br />Additional Items <br />Your written response to this letter plus all revised maps constitute additional application materials, which <br />must be additionally filed at the county clerk and recorder with your initially filed materials. Please file your <br />responses there promptly, and send me the receipt for this filing. <br />