My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105455
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:25 PM
Creation date
11/24/2007 12:19:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 101 State :Colorado Permit/job # : C-80-007 <br />Date: 09/19/2006 County :Gunnison Abbreviation :none <br />User : TAK Site :West Elk Mine Filename :0007-101 <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Replace topsoil from stockpile to add'I disturbance at mine entrance <br />HOURLY EQUIPMENT COST ~ Shift basis : ~~ 1 per day ~~ <br />f0-12 cv. 6x4 <br />-LOatler :CAT 966G (20( <br />Support equipment -Load area :Cat D9R - 9SU <br />-Dump area :Cat D9R - 9SU <br />Road maintenance -Motor grader :NA <br />-Water truck NA <br />Cos[ Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename: truck2 loader dozer dozer NA NA <br />Utilization-machine : 100 90 100 100 NA NA <br />-Ripper attachment: NA NA 0 0 NA NA <br />Ownership cost/hour: $11.86 $29.75 $64.72 $64.72 NA NA <br />Operating cosUhour: $41.22 $34.36 $98.84 $98.84 NA NA <br />Ripper op. cosUhour: NA NA $0.00 $0.00 NA NA <br />Operator cosUhour : $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals: $74.83 $96.89 $196.34 $196.34 NA NA <br />Number of units : 2 1 1 1 0 0 <br />Group subtotals: Work: $246.54 Suppod: $392.68 Maintenance: $0.00 <br />Total work team cesUhour : $639.21 <br />Initial Swell Loose <br />volume: 645 CCY factor : 1.125 volume: 726 LCY <br />Source of quantity take-off :Division estimate <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Tolal cost : $0 <br />HOURLY PRODUCTION <br />Truck Caoaciri <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Earth -Dry packed Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 13.88 LCY Adjusted volume': 12.00 LCY <br /> Final truck volume based on number of loader passes : 8.55 LCY <br /> - Wck volume atljustetl to not exceetl raletl payloetl or heepetl volume <br />Loading Tool Caoaciri : Job Condition Corrections : Site altitude (ft.) : 6,300 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.:Other- soil, boulders, owls (80 -100%) Altitude adj.: 1.000 0.920 (Cat HB) <br />Bucket fill factor : 0.900 Job efficiency : 0.830 0.830 (user) <br />Adjusted bucket capacity : 4-275 LCY Net correction : 0.830 0.764 <br />
The URL can be used to link to this page
Your browser does not support the video tag.