My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105455
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:25 PM
Creation date
11/24/2007 12:19:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />Permit or other job action :Permit Renewal RN-OS <br />Task description :Replace topsoil from stockpile to RPE road <br />,. _..< ;. <br />HOURLY EQUIPMENT COST Shift basis 1 per day <br />Truck/loatler team -TmcK :Generic 10-12 ~ <br />-Loader :CAT 966G (20( <br />Support equipment -Load area :Cat D9R - 9SU <br />-Dump area :Cat D9R - 9SU <br />Road maintenance -Motor grader :NA <br />-Water truck : NA <br />Cost Breakdown : ruck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />Utilization-machine : 97 100 100 100 NA NA <br />-Ripper attachment: NA NA 0 0 NA NA <br />Ownership cosVhour: $11.86 $29.75 $64.72 $64.72 NA NA <br />Operating cosUhour: $40.08 $38.33 $98.84 $98.84 NA NA <br />Ripper op. cosVhour: NA NA $0.00 $0.00 NA NA <br />Operator cosUhour : $21.75 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals: $73.68 $100.85 $196.34 $196.34 NA NA <br />Number of units : 4 1 1 1 0 0 <br />Group subtotals : Work : $395.59 Support : $392.68 Maintenance : $0.00 <br />Total work team cosUhour : $788.28 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 516 CCY factor : 1.125 volume : 580 LGY <br />Material weight : 2, 550 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Earth -Dry packed Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity : 13.88 LCY Adjusted volume': 12.00 LCY <br /> Final truck volume based on number of loader passes : 8.55 LCY <br /> 'trunk volum e atllustetl to not exce etl rale0 payloatl or heape0 volume <br />Loading Tool CaoaciN : Job Condition Corrections : Site altitude (ft.) : 6,300 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.: Other -soil, boulders, roots (80 - 100%) Altitude adj.: 1.000 0.920 (Cat HE <br />Bucket fll factor : 0.900 Job efficiency : 0.830 0.830 (user) <br />Adjusted bucket capacity : 4.275 LCY Net correction : 0.830 0.764 <br />
The URL can be used to link to this page
Your browser does not support the video tag.