Laserfiche WebLink
in C9rnpl-~~er>P~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY `~ <br />Department of Natural Resources <br />1313 Sherman St, Room 215 C O L O RAD O <br />Denver, Colorado 80203 D[ v[ s[ o N o r <br />Phone: (303) 8663567 MINERAL S <br />FAX: (303) 832106 G E O L O G Y <br /> RECLAN ATION•NINING <br /> SA FETY•SCIENCE <br /> Bill Owens <br />August 25, 2003 Governor <br />Greg E. Walther <br />MI. Blll Wright Executive Director <br />Baca Cotmty ~ Ronald W. Cattany <br />741 Main Division Director <br />Springfield, CO 81073 Natural ftesoun a Trustee <br />Re: Hinds Pit #35, FSIe No. M-2003-070, Receipt of 112 Construction Materials Reclamation Permit <br />Application Package <br />Dear Mr. Wright: <br />On August 19, 2003, the Division of Minerals and Geology received your 112 Construction Materials Reclamation <br />Permit Application package for the Hinds Pit #35, File No. M-2003-070. Preliminary review of the information <br />received determined that the following items must be received before the Division can consider your application as <br />being submitted and technical review can begin: <br />riIXAiRTT P _ Mnnicjpalitiec Within Two Miles tRnle 6.4.1 file Please list any murllelpallty(5) within <br />two miles of the proposed mining operation and address of the general office of each municipality. <br />Your application will not be considered submitted until the infoEmafion listed above is received and found <br />sufficient to begin our review. A decision date will be established 90 days from the date of receipt of all of the <br />requested information. Additionally, if you have already published notice you will need to republish notice, after <br />the Division considers the application submitted. This notice must be published once a week for four (4) <br />consecutive weeks, starting within ten (10) days of the date your application is considered submitted. We will <br />notify you when you should initiate republication of your notice. The final date for receiving comments is the 20th <br />day after the fourth publication or the next regulaz business day. <br />You have sixty {60) days from the above date to submit all necessary documents that the Office needs for an <br />application to be considered filed. If, at the end of the sixty day period, the application has not been determined to <br />be filed with the Office, the Office shall deny the applicaton and tem3inate the application file. <br />This letter shall not be constmed to mean that there aze no other technical deficiencies in your application. The <br />Division will review your application to determine whether it is adequate to meet the requirements of the Act after <br />submittal of all required items. <br />Sincerely, <br />.~ <br />uzi E ' en <br />Program Assistant <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />