Laserfiche WebLink
<br />HbL`RLY PRODUCTION: <br />Scraper Cycle Time <br />Load = <br />0.9 min. <br />Maneuver & spread = 0.7 min. <br />Travel time (haul & return): <br />Haul route <br /> <br />Job Condition Correction Factora ~ <br />Site altitude = 5100 ft. <br />4..~ nr 4 4 " wr wr wr wr ..r <br />Alt. adjustment .. 1 <br />Job efficiency ... 0.83 (lsh/d) <br />Net Correction 0.83 <br />Road Length Grade Rolling Total Velocity Travel time* <br />seg. # (ft) res.(%) res.(%) res.(%) (fpm) (min) <br />1 400 0.00 10.00 10.00 669 0.68 <br /> <br /> Haul time = 0.68 min. <br />Return route "'"""'"'""`""" <br />1 400 0.00 10.00 10.00 1079 0.49 <br />*lst 8c last seg. adj. for accel./decel. Return time = 0.49 min. <br /> <br />Total Cycle Time = 2.77 min. ; <br />`"""'""" Machine Volume <br />Machine Payload "`""`"``""' <br />'""`"""""`"` Struck capacity = N/A <br />Material weight = 1600.00 lbs/LCY Heaped capacity = 22.00 <br />Mat. description "`""""` <br />Top Soil Average = 22.00 LCY <br />•r nr n.titi+rt"~""~w nr"nr nrM1S wr"n.Y"""wnrtissti"tinrss~r ~ "wr nrti nr4 wr •r nr44 <br />Rated payload = 50,000 lbs. Adjusted volume = 22.00 LCY <br /> <br />Payload volume = 31.25 LCY <br />Unadjusted production per scraper or push-pull pair 476.18 LCY/hr <br />Adjusted production 395.23 <br />nr"r w.ti nrti nr4"4 LCY/hr <br />Adjusted hourly fleet production 395.23 LCY/hr <br />JOB COST: <br />Fleet size 1 Scraper(s) Total Job Time: 128.19 Hours <br />Unit Cost $0.354 /LCY Total Job Cost: $17,935 <br />