Laserfiche WebLink
<br />EXHIBIT D - RECLAMATION PLAN <br />PECK PIT <br />When mining is completed the bar will have a <br />northerly slope the same as the river gradient <br />and a westerly slope of 1 foot in 500 feet. <br />Ail banks will be mined at a 3 to 1 slope <br />Seeding will be as recommended by the Soil Conservation <br />Service. <br />Estimated Reclamation Costs <br />D-5 Cat for finish grading 10 hrs. <br />550.00/hr. 5500.00 <br />Seeding and fertilizer $200.00 <br />Total Estimated Reclamation Costs 5700.00 <br />