Laserfiche WebLink
• <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Dem~er, Colorado BO?03 <br />Phone 1303) 866-3581 <br />FAX (303) 866 3589 <br />III IIIIIIIIIIIIIIII <br />~TaTF OF COLORADO <br />III IIIIIIIIIIIII III J ~~OF CO~. <br />i <br />I ~c0~ <br />.-~l~Gf. <br />18]6 ~. <br />Response to Reclamation Permit Application Consideration <br />Roy Romer <br />Governor <br />lames 5 Lochhead <br />6e<utive Director <br />Hal D. Simpum <br />DATE: August 6, 1997 Slale Engineer <br />TO: James C. Stevens, Senior Environmental Protection Specialist <br />CC: Division 2 Office; District 12 Water Commissioner RECEIVED <br />FROM: Heidi Frey, P.E. ~%~~ <br />RE: Parkdale Project Pit, File No. M-97-054 AUG 0 6 1997 <br />Operator: Agile Stone Systems, Inc., Contact: Bill Fehr <br />(303) 741-2556 Division of Minerals a u6Jioy; <br />Section 12, Twp 185, Rng 72W, 6th P.M., Fremont County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed m the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then obtain <br />a waiver of objection from all well owners with wells within 600 feet of the permit area or request a <br />hearing before the State Engineer. <br />® Other: The applicant anticipates pumping 30,000 gpd from a proposed well to be used within the <br />process. The applicant must obtain a well permit, and without an approved plan for augmentation, it <br />is unlikely that a permit can be approved. <br />COMMENTS: This office recommends that the proposed project not be approved until the applicant has <br />obtained a plan for augmentation or an approved substitute water supply plan to replace depletions caused by <br />the pumping of ground water from a well. <br />