Laserfiche WebLink
2.03.8 - Permit Term Information <br />•• <br />Walden Coal is currently actively backfilling the entire pit. <br />It is expected that backfilling, grading, topsoiling and revegetation <br />will be completed by the end of 1988. <br />L~ <br />• <br />#I <br />~pny;.r~ 8-188 <br />