Laserfiche WebLink
<br />3. Owners>) of mineral rights to substance to be mined <br />8. Descr:ption of Rehabilitation <br />t a. ]?roposed rehabilitation land use(s):Pastureland and ponds <br />b. ;iource of technical advice for reclamation:Colorado Division <br />' Hof Wildlife. USDA Soil Conservation Service <br />c. :Explanation of Reclamation Process:Side slopes graded to no <br />steeper than 3H:1V. Topsoil will be stripped, stockpiled, <br />I and redistributed for seeding throughout, as minina <br />progresses. Shorelines will be graded, topsoiled and seeded <br />for reclamation. Compacted areas-plant site, stockpile <br />areas, haul areas- will be scarified, topsoiled. and seeded. <br />For a more comprehensive description, please refer to <br />Exhibits E and F of the accompanvina packet of materials. <br />Name:C & H Comaanies Address:Niwot. CO 80544 Phone:443-1099 <br />4. Source of applicants' legal right to enter and to mine on the land <br />described:Please refer to Exhibit 0 of accompanying packet. Lease <br />with Helba Grave Distel: title policy from Transamerica Title <br />5. Address of applicant and general office <br />Applicants Address:7916 Niwot Rd:Niwot.CO 80544 Phone:352-6057 <br />General Office Address:Box 490.Niwot.CO 80544-0490Phone:352-6057 <br />6. Identify any prior permits for mining held by applicant or <br />affiliated person:MLRD H-84-198: HLRD H-82-225; HLRD N-73-107 (All <br />Boulder County) <br />7. Description of Operation <br />a. Types and number of operating and processing equipment to be <br />employed:Portable Conveyor-2.500-3,000feet:Crusher-i:Screen- <br />2; Dewatering Screw-1;FrontLoader-2:Excavator-1:Classifier-1: <br />Scale House/Office- 1;25-Ton(EndlDump Trucks-12;Please see <br />attached Exhibit D. <br />b. Haximum number of employees: 8 and number of shifts: 1 <br />' c. Nlumber of stages to be worked:l0 phases and periods of time <br />each is to be worked:Approximately one year will be spent <br />_minina each phase, dependent upon material market. <br />d. i'hickness of mineral deposit:4 to 17 feet, and thickness of <br />t:he overburden:0 to 7 feet. <br />' e. This will be a wet/dam! pit operation. <br />f. :Site entrance/exit points and county roads and bridges to be <br />I utilized between site and delivery point(s) !must be <br />coordinated with County Engineer):Site access will be from <br />{iCR 20-1/2. Traffic will use WCR 20-1/2 west to County Line <br />' ]toad, Please see accompanvina Traffic Statement. Have <br />coordinated with Drew Scheltinaa. <br /> <br />1 <br />