Laserfiche WebLink
OJ/1J/08 09:80 PAE 970 J48 J777 Calvin Snk:errrisee t/ ®002/OOd <br />2SC/G~-M /~1' ~oG -oflj <br />~y' irelrh b. crouch <br />Keith M. Crouch, r.c. '°°~°°`"~°°"°" <br />6015 Tnlietsoll Plaee ~ Boulder, CO 80303 <br />Phone (303) 9287016 or (970) 396-1000 ~ Fax (903) 444-6824 or (970) 346-3777 <br />Muth 13, 2008 <br />RECE11/Ep <br />Vta Facsimile 303-Brit-B. / <br />Civil Rasouraas '19 v ~ 1 ~ 2006 <br />Division d Geology and Minerals Oirisian of Mtn,gis 8 8sobyr <br />1313 Sharman Sheet Room 215 <br />Denver,tA 80203 <br />Re: Hell Irwin Corporation Pa1'ker-Dersham Resource, FJ2 of Section 38, T1N, <br />Rb'7W, 8~ PM, Weld t',ourrq~, Cobredo and Merit Energy Corporation's OII <br />end Gas Leasehold Interests in the FJ2 d Section 38 <br />Dear Aft. Ortir <br />This letter is betrrg submitted in resp0~ to an un Pubac Notice corrceming <br />an apptleatlon for a Regular (112) Cons4uctiorr Materials Redagtation Pernit for tire <br />Padker-Denham Resarrte. <br />Merit Energy Company ('Merit") is the owner and operamr d oN and gas lessee <br />that cover the F12 d Section 38 above dasdbed as follows: <br />NE/4 d Section 36: <br />eauar 41-38 Well In the NE/4NFJ4 d Section 38 <br />Oberger 42-38 WsAI !n the SE/4NE/4 d Sed)on 36 <br />F_ibarger 32-38 WeN in the SW/4NFJ4 d Section 38 <br />SFJ4 if Section 3B: <br />Kirby 33-38 Well In the NW/4SE14 of Section 39 <br />Merit does not plan any further operations ]n the NtJ4 d Seeticvr 38 other than <br />routine rra4ktar-ance operations and pertraps some production stimulatlon operatlwrs <br />ltrat may induda restimulation operations_ Those operations wib require the use d hixdk <br />mounted drlti4tg rigs that require a flat woridng space around fire wellhead d each d the <br />wells daec-ibed above d riot Itsss than a 1ti0-foot radius around ead- of the wel-heads of <br />the wells. In addition, the HalEUwin operations should rroi Impact Merit's access to the <br />wells and the HeA-Irwin operations should not impact the flowllrres for th wa6s and the <br />productiiar t for the wells. In orter to ensure the wells th the NEl4 of Seen 38 <br />are not impachrd by Ha!!-Irwin's operations, there need to be sdequaEa setbacks fmm <br />the weliheada d the wells and the production facNifias for the weld. In addition, the <br />flowlines need th ba providsd with adequate protection by keeping the sand and gravel <br />