Laserfiche WebLink
M<4 <br />e <br />t <br />R r <br />• I�r M <br />1 <br />Y <br />_ ,i L�f • <br />i `f <br />�FI <br />- "M . <br />•;% 44 k <br />s <br />PLAN VIEW <br />11= 401 <br />\\ Construct Berm <br />EMERGENCY SPILLWAY <br />FLOW LINE £L. 6152.8 I <br />II-- e <br />ORIGINAL GROUND <br />E L. 6148.5 <br />COLLECTING POND X- SECTION <br />AT EMERGENCY SPILLWAY <br />1° = lo' <br />EXCAVATION 925 Cu. Yds. <br />. . I <br />NORTH FORK GUNNISON RIVER <br />EL. 6154.5 <br />RIPRAP 24 Sq. Yds. <br />50% Larger than 12 In <br />greater dimension, 18 <br />ni <br />mimum thickness. <br />RIVER <br />Edge <br />I.I /2 1 *- <br />a <br />TYPICAL DITCH AND BERM SECTION <br />I ., = 101 <br />RIVER <br />NOT E <br />Bend longitudinal oars inru sioyq, <br />paving reinforcement, minimum 12 <br />VOL. POND *351 A.F. <br />AREA TOP 5040 SQ. FT. <br />AREA TOP WATER 4352 SQ. FT. <br />AREA BOTTOM POND 3296 SQ. FT. <br />�-8,--� <br />�EL, 6154.5 <br />24 °- -�St— 36... <br />EMERGENCY SPILLWAY X-SECTION <br />1"= 1' <br />END VIEW <br />REBAR 12° C-C <br />DIRECTIONS <br />Reinforcing Steel Grade 60 No.4 <br />Concrete - 3000 PS I 28 Day <br />I8° C -C <br />SIDE VIEW <br />EMERGENCY SPILLWAY END SECTIONS <br />CONCRETE SLOPE PAVING DIMENSIONS <br />1/2 °= I' <br />I hereby certify that these construction plans <br />for the Hawksnest Mine East Mine Sedimentation <br />Pond were prepared under my direct supervision. <br />Colo. P.E. No. 15219 <br />0 <br />Permit Number #: C- 1981 -016 <br />Class: Permit <br />Section /Exhibit : Rule 2 <br />Jj 0:)-- 3 <br />WESTERN SLOPE CARBON <br />HAWKSNEST MINE <br />EAST MINE SEDIMETATION <br />N. <br />,�. .e IIYTBRIIfOUJYTAIA► <br />s TBGHIVIGAL SERVICES. A1AC <br />Box 3376 - Grand Junction. CO 81501 <br />DATE: <br />POND <br />DRAWN BY: KLF <br />EXHIBIT 2.05.3-F <br />1 111111 VIII VIII VIII VIII VIII IIII IIII <br />