My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105186
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:13 PM
Creation date
11/24/2007 12:01:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977053
IBM Index Class Name
Permit File
Doc Date
8/9/1996
Doc Name
LYLE SMITH PIT PN M-77-053 BOND ESTIMATE RECALCULATION
From
DMG
To
ASPHALT CONSTRUCTORS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RECLAMATION COST SUMMARY cant'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />n/a <br />SubtoteL (K): <br />____________ <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />___.___.I_________________________________~_________._____I_~___r_.__ <br />Ma <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Lost (S) <br />________I__________________________________________________I_______~~_ <br />Demolition <br />7 ~ Seeding and other reveg tasks, 5.25 ac ~ f2,625 <br />Fencing <br />8 ~ Mob/Demob from Alamosa, dozer 8 tractor ~ f860 <br />Subtotal (M): 53,505 <br />TOTAL DIRECT RECLAMATION COSTS (subtot els A through N): 517,178 <br />Il. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (S) <br />i ________I__________________________________________________I____________ <br />I. ~ Public Liability Insurance.... 1.550% of dir. ~ f17S <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ f109 <br />3. ~ Contractor's Profit........... 70.00% of dir. ~ f1, TT8 <br />4. ~ Job Superintendent.. <br />Subtotal (A): f1,400 <br />i TOTAL CONSTRUCTION CONTRACT ANp/NT (direct plus 0 8 P): ft2, 578 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />ITem No.~ Item Description ~ Cost (f) <br />M_.___I__________________________________________________I____________ <br />). ~ Minerals Program Adnin. Fee et 5.00% of cntr.~ f629 <br />NET INDIRECT COST PERCENTAGE: 18. 15X Subtotal (B)• f629 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f2,029 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs):--_ 513,207- <br />
The URL can be used to link to this page
Your browser does not support the video tag.