Laserfiche WebLink
• <br />RECLAMATION COST SUMMARY cont'd <br />D. EARTNNORK - FILL COMPACTION <br />Tesk No.~ Task Description ~ Cost (5) <br />n/a <br />E. EARTNYORK - RIPPING <br />Tesk No.~ Tesk Description <br /> <br />3.1 ~ Rip asphalt pavement an ramp and floor, 1.25 ec ~ 5250 <br />3.2 ~ Rip floor and ramp for crnpaction, 3.25 ac ~ 5488 <br />i <br />sheet 2 of 4 <br />Subtotal (D): <br />Lost (5) <br />Subtotal (E): 5738 <br />F. EARTNWRK - ROAD RECLAMATION <br />Task No.~ Task Description ~ Cost (S) <br />________I_..____.._______.____~______.,._________________~_.__I_______..____ <br />~ n/e ~ <br />G. EART NVORK FINISH GRADING <br />Task No.~ Task Description <br />4 ~ Smooth grade north wall <br />Subtotal (F) <br />cost (5) <br />5484 <br />Subtotal (G): 5484 <br />