Laserfiche WebLink
Date: February 18, 2003 <br />To: Joe Ga~liano <br />From: Laity Oehler <br />Re: File No. M-2003-! 1 R. D G HusAin Construction Company. Vclardc I'+t. Adcyuacy Review Items <br />The fallowing hams must be addressed by the applicant in order n+ s;disfy the at~plicuhlr requirements o(CR.S. 34- <br />32.5-101 et seq. and the Corstniaion Materials Rules and Regulanions of the Mimi Land Reclamation Board. <br />General <br />1. Rule 6?.1(2)(e) smtes that the acceptable range of map stairs shall nm he larger than 1 inch = 50 feet nor <br />smaller than Iinch = 560 feet. Please provide maps in this stale range, c.xccpt for the location map. <br />Exhibit C-Pre-mining and Mining Plan Map(s) of Affected Lund. <br />2. Please show on a Wrap in this rxhihit the power line that cn+ssus rite pn~rused permit area and affected lands <br />area. This is an east-west power line lucatetl near the nenh permit boundary. Show also the name of the <br />ownrr o(lhe power lint. Rule 6 ~t3(a) and (gt <br />3. On a trap in [his exhibit show the acccss/haul ntads at/tiznn the ruunt}~ mad.:u affected land. This is <br />necessary because tha Division learned during the pre-opcr,uiun tmpcction that the roads are to be <br />signilicantiy upgraded. (Kole 6.4,3ut) and Rule !.1(3)1 AJdition al ibr haul/utters roads as al-totted land <br />will constitute an amendment of this application. Rub_ i.8 will apph•. phis rule at section 1.8.1(6) requires <br />[hat a new decision date be set purwant to subparagraph Lb. B. wftitlt rcymres that all applicable deadlines <br />shall begin anew. 'i'bis rule also requires th:u the apphcant publish and mail a new notice of the <br />application. <br />4. Please show an your maps and on the map legend an affected ianJ bowid:up. It is obvious that the <br />hourdary, until the roads arc added to affected land, is the outer houndm'}' of the phases. However, the <br />boundary is not named on the mtaps or shown in the Icgr, m! wiilr a .cymhnl. <br />Exhibit D - Mininst Plaa <br />5. Your exhibit states [hat "Contrite and or asphalt batch plant. wiH he c~rrnrtl on site as needed --- <br />Ifthe demand is sufficient at warrvtl, dtey Wray h«ontr prrntan•_nt for drc life of the mine." Since the <br />Division must maF:e a decision u. approve ur deny ihr application based on what it contains. either show <br />the location and plans for construcdne such prrnanrnt pl:mt. or delete the rclcrcnrc to permanent plants <br />!'tom the application. Any such plans should include pl.ms Fur rr~mainmrnt of any potential spills of <br />petroleum products and other pctemial nmtaminant.. <br />6. If the : oncrete and or asphalt hatch plants arc ponuhlr planes. ,rate sr: 11 an asphalt batch plant is <br />proposed. provide your plans for c:ontainntent of al l petroleum }traduce and other potential contaminants. <br />7. Y-our application states "Ovcriund cunvr.y:+rs may also be rmpluvnl during the life of this mine to <br />transport material to the processing areas." Please clarify this scucmenl. kill the conveyors be pormhle, <br />temporary equipment set up to operate within the prnently ivuposed phases of mining^. If the conveyors' <br />