My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105131
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:11 PM
Creation date
11/24/2007 11:55:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002118
IBM Index Class Name
Permit File
Doc Date
12/12/2003
Doc Name
Adequacy Review Response
From
Joe Gagliano
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "D" <br />Mining Plan <br />6.4.4 Exhibit (D) Mining Plan <br />All areas to be mined are considered high and dry with no groundwater to be encountered <br />during mining. The deposit is fairly deep, ranging from 0.5' deep to possibly 45' deep, <br />along the upland deposit. <br />Excavation is to be an open pit with the use of standard mining equipment used for such <br />operations, eg. Scraper, dozer, wheel loaders, excavators and draglines. However, due <br />to the life of this mine, other types of equipment not yet economical for gravel may be <br />employed in the future. <br />Processing wilt take place on site in order to size by crushing and screening, and some <br />reject material will be used for final reclamation. Also a portable concrete andlor asphak <br />batch plants will be erected on site as needed for projects in this part of the state of <br />Colorado. All spilt prevention, control and countermeasure (SPCC) n:gulation 40 CFR 112 <br />as per the United States Environmental Protection Agency. <br />As much as possible, mining will-be conducted in such a way as to facilitate reclamation, <br />such as pushing slopes to a 3H:1V when practical. Reclamation will follow in a timely <br />manner once an area is deemed mined-out. Seeding and final grading will be to a final <br />reclamation use of rangeland, which the landowner has prescribed. <br />The following will address the items listed under Rule 6.4.4 - Exhibit D - in order of <br />appearance: <br />Please see Mining Plan Map for more information and correlation's. <br />6.4.4 <br />(a) Like similar open-pit sand and gravel operations, this pit will be stripped of the available <br />topsoil (growth medium) by earthmoving scrapers and loaders, and will be placed along the <br />areas bounding the mining areas and left in place until needed for re-topsoiling. These <br />topsoil stockpiles will be seeded to reduce soil erosion. <br />(b) All earthmoving will be done by mining equipment suitable for this type operation, <br />including the following types: crawler dozer, wheel loaders, earthmoving scrapers, <br />excavator, draglines, and haul trucks of various sizes up to and including haul units with <br />a 50-ton capacity. No overland conveyors will be used. <br />(c) The only water diversions would be for stormwater management to keep all stormwater <br />
The URL can be used to link to this page
Your browser does not support the video tag.