My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105124
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:10 PM
Creation date
11/24/2007 11:55:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006073
IBM Index Class Name
Permit File
Doc Date
2/20/2007
Doc Name
Response to Preliminary Adequacy Review-01
From
Banks and Gesso, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.~' <br />~~ Banks and Gesso, LLC f <br />February 20, 2007 `~ <br />David A. Bird `~/ <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver. CO 80203 <br />Subject: Response to Preliminary Adeguac <br />Resources, Regular 112 Application, <br />Dear Mr. Bird: <br />720 Kipling St.,Suite117 <br />Lakewood, Colorado 80215 <br />(303) 274-4277 <br />Fax ( fi27~83291 P~ <br />www. banksandgesso. com <br />FEB 212007 <br />Division of R=.~.~..~ ..,.on, <br />Mining aYtL SiliGiy <br />/~ <br />1 for Sundance <br />No. M-2006-073 <br />Lafarge is in receipt of the Preliminary Adequacy Review-01 comments for our <br />Sundance Resources Regular 112 Application, File No. M-2006-073. Banks and <br />Gesso, LLC, has been retained to compile adequacy responses and submit this <br />response on behalf of the applicant. <br />This response also includes, for the record, a revised and more detailed plan for <br />certain technical features of the operation. These revisions include: <br />1. Pre-mining installation of a slurry wall. To reduce groundwater exposure <br />and mitigate depletion effects of de-watering operations, the applicant <br />plans to install a slurry wall around the perimeter of proposed water <br />storage cells before those areas are excavated. This plan will involve <br />installation of the wall and maintenance of appropriate setbacks and side <br />slopes, as a result reducing the total mining plan in corresponding areas. <br />2. Additional berming. To address visual impacts and other concerns in the <br />local review of the resource extraction proposal, the applicant plans to <br />expand berms to include not only screening of the plant and processing <br />area and Phase 1, but most mining operations as well. The pre-mining <br />installation of slurry walls facilitates this dedication of additional <br />overburden to stockpiling as screening berms. <br />Our responses to comments raised during the adequacy review are given below <br />in the order in which they were presented, referencing the appropriate Exhibit. <br />As discussed further below, the applicant intends to submit these responses in <br />order to meet the March 2, 2007 decision date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.