My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105117
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:10 PM
Creation date
11/24/2007 11:54:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
Permit File
Doc Date
9/29/1977
Doc Name
APPLICATION FOR MINING AND RECLAMATION PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase Three <br />• Systems Maintenance <br />All Phase Three costs are contained above, under Supervision, maintenance, <br />and irrigation operation, etc. <br />Additional First Year Costs <br />Additional Reclamation costs the first year will include purchase of a used <br />farm tractor and used chisel ploy and possible other implements for soil <br />preparation. <br />$3500.00 <br />Fiberglass eater tank for drip irrigation system <br />Other possible additional costs <br />$1500.00 <br />During the fifth season of reclamation activities, attempts will be made <br />on reclaiming some of the highvall areas, (Gold Rill). In some cases, tran- <br />• sport of plant media to bench areas may be necessary. If this is the case, <br />it is planned that the total acreage reclaimed that season be reduced to <br />effectively stay within budgeted amounts of monies available. Transport of <br />plant media to some areas might increase overall reclamation costs as high <br />$600.00 per acre. It is planned that reduction in reclamation costs by the <br />fifth field season should result in a maximum total cost per acre of $1500.00. <br />Summary of Reclamation Costs <br />Total cost per acre reclaimed .$1237.50 <br />Annual cost $4950.00 <br />Depreciated equipment cost, first year $ 800.00 <br />Total first year cost $5750.00 <br />Cost per ton ore, @170,000 tons Annually $ .0338 <br />
The URL can be used to link to this page
Your browser does not support the video tag.