Laserfiche WebLink
Phase Three <br />• Systems Maintenance <br />All Phase Three costs are contained above, under Supervision, maintenance, <br />and irrigation operation, etc. <br />Additional First Year Costs <br />Additional Reclamation costs the first year will include purchase of a used <br />farm tractor and used chisel ploy and possible other implements for soil <br />preparation. <br />$3500.00 <br />Fiberglass eater tank for drip irrigation system <br />Other possible additional costs <br />$1500.00 <br />During the fifth season of reclamation activities, attempts will be made <br />on reclaiming some of the highvall areas, (Gold Rill). In some cases, tran- <br />• sport of plant media to bench areas may be necessary. If this is the case, <br />it is planned that the total acreage reclaimed that season be reduced to <br />effectively stay within budgeted amounts of monies available. Transport of <br />plant media to some areas might increase overall reclamation costs as high <br />$600.00 per acre. It is planned that reduction in reclamation costs by the <br />fifth field season should result in a maximum total cost per acre of $1500.00. <br />Summary of Reclamation Costs <br />Total cost per acre reclaimed .$1237.50 <br />Annual cost $4950.00 <br />Depreciated equipment cost, first year $ 800.00 <br />Total first year cost $5750.00 <br />Cost per ton ore, @170,000 tons Annually $ .0338 <br />