Laserfiche WebLink
<br />LIST OF OTI~R PERMI75 REQUIItED: <br />To the Operators knowledge the only other permits required for the proposed operation are: <br />1. Excavation Permit with the Ciry of Ouray <br />2. CDOT Access Approval <br />Since there is no defined drainage for Bridalveil Creek, a Corp of Engineers Dredge and Fill Permit is not <br />required to construct the barrier channel. <br />