Laserfiche WebLink
<br />/Many Block <br />// Excel Energy <br />16805 WCR 19'/ <br />Platteville, Co 80651 <br />Western Mutual Ditch Company <br />Note: The Division of Minerals and Geology (`'Division") shall not be a party, but shall <br />participate in the hearing as staff to the Boazd. <br />III. ISSUES TO BE CONSIDERED <br />Presentations to the Boazd shall be strictly limited to the issue of whether the pending application <br />complies with the requirements of the Colorado Land Reclamation Act for the Extraction of <br />Construction Materials, Sections 34-32.5-101 et seg, C.R.S. ("Construction Materials Act"), and <br />the rules and regulations promulgated by the Board. The parties shall limit presentations to the <br />questibn of whether the pending application should be approved or denied, based on the issues <br />stated below. <br />1. Reclamation plan with respect to environmental protection of surface water run-on, run-off, <br />dischazge, and goals and expectations. (Michael Decker) <br />2. Potential impacts from mining operation to adjacent landowners domestic wells, irrigation <br />wells, irrigation ditches and alluvial groundwater used for subimgation. (Kathryn A. Hazdin; <br />Michael Ptasnik; Scott, Brochard, Depratt, Odenbaugh, Reinick & Rippe; Michael Decker; <br />Beth Decker; Western Mutual Ditch Company) <br />3. Presence of wetlands, necessary mitigation and need for 404 Permit. (Michael Ptasnik; and <br />Scott, Brochard, Depratt, Odenbaugh, Reinick & Rippe) <br />4. 100 year flood plain analysis, mitigation and set back requirements (Michael Ptasnik; Scott, <br />Brochazd, Depratt, Odenbaugh, Reinick & Rippe) <br />Evaporative loss from the reclaimed lake surface and water augmentation plan (Scott, <br />Brochazd, Depratt, Odenbaugh, Reinick & Rippe) <br />6. Containment and disposal plan for mine and plant generated chemicals and other by- <br />products. (Scott, Brochard, Depratt, Odenbaugh, Reinick & Rippe) <br />Potential wildlife habitat loss and delineation of buffer zones to protect eagle roost habitat. <br />(Michael Ptasnik) <br />8. Reclamation cost estimate, consideration of what structures were considered. (Scott, <br />Brochard, Depratt, Odenbaush, Reinick & Rippe) <br />