Laserfiche WebLink
<br />:~ <br />Reclamation plan for: Loukonen Bros. Stazks Quazry <br />The plan for the Stazks quarry, is to remain open until all usable stone is removed <br />from the quarry site. <br />At the time of reclamation the quarry site will be back Belled with waste rock to <br />approximate the exisiting slopes. Then the stocked surface materials will be used <br />to recover the quarry area. <br />Estimated reclamation time - 7 days x Crew #1 .. Costs $7140 <br />Da~Costs Breakdown <br />D7 Cat w/ripper $270.00 <br />3 Qperators $360.00 <br />Excavator $270.00 <br />Truck $120.00 <br />$1020.00 <br />• <br />• <br />