My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104986
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:04 PM
Creation date
11/24/2007 11:47:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Permit File
Doc Date
2/23/1995
From
DEPT OF ARMY
To
ANIMAS AGGREGATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flEPLY TO <br />ATTENTION OF <br />• <br />• <br />DEPARTMENT OF THE ARMY <br />U.S. ARMY ENGINEER DISTRICt, SACRAMENTO <br />CORPS OF ENGINEERS <br />1325 J STREET <br />SACRAMENTO, CALIFORNIA 95814-2922 <br />February 23, 1995 <br />Regulatory Branch (199475260) <br /> <br />Mr. David King <br />Animas Aggregates <br />Post Office Box 788 <br />Dolores, Colorado 81323 <br />Dear Mr. King: <br />This letter is written to reiterate your telephone <br />conversation with Susan Nall of this office on February 17; 1995, <br />regarding the Thomas Pit gravel mining operation on the Animas <br />River north of Durango. Additional information is requiredi to <br />complete the permit application that was assigned number <br />199475260. <br />As discussed by telephone, clarification is required i'or the <br />following: <br />1. Provide the open water surfaces areas (in square feet) for <br />the northwest corner of the permit area, the western dredgE: basin <br />(between station numbers 4+00 to 18+00), and the ditch and <br />settling pond for the sand wash plant. The northwest area was a <br />previous gravel pit that has been breached by the river and is <br />located between station numbers 20+00 to 26+00. This information <br />is necessary for consultation purposes with the Fish and Wildlife <br />Service on endangered species. <br />2. We understand that the method of mining occurs from they west <br />bank by use of a large backhoe, and that a discharge of dredged <br />or fill material is not placed within the river for the gravel <br />harvesting. The schedule for instream excavation is from <br />September to April. If these descriptions are not accurate, <br />please advise us. <br />3. Resubmit the cross-section drawings with a larger vertical <br />scale. This will provide more clarification during the public <br />notice process. We recommend one drawing per page. <br />4. Submit a cross-section diagram of the river near station <br />23+00 where the old gravel pit has become part of the active <br />channel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.