My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104975
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:04 PM
Creation date
11/24/2007 11:46:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989044
IBM Index Class Name
Permit File
Doc Date
4/7/1989
Doc Name
LMITED IMPACT OPERATION 110[2] APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />WE HAVE A~UIRED NECESSARY PERMTT FOR AO~'SS FROM THE STATE HIGHWAY <br />DEPAKIT'!Q]'P. THE Fd~AD6 WILL BE 30 FEET WIDE WPI71 3 INCHES OF ROAD BASE <br />GRAVEL. <br />SEE EXHIBIT B PAGE 6. <br />THE WATER TABLE IN THE LAKE AREA IS FED BY SPRINGS AND IS NA`I'[IRAI.LY <br />HIGH. WE PLAN TD PUMP THE WATER AND GRAVEL TO A 3 DECK SCREENER FOR <br />WASHING AND SIZEING. THE WATER WILL RETURN TO A SEPARATE POND FOR SETTELING <br />OUT THE MUD, THEN RETUis] Tq THE LAKE TO BE USED AGAIN. <br />SEE EXHIBIT C PAGE 7. <br />WE HAVE OOi~lTACPED THE DIVISION OF WATER RESOURCES, AND TI{E ARMY CORPS. <br />OF ENGINEERS FOR THEIR APPRIVAL. <br />SEE EXHIBIT C PAGE 8, 9, and 10. <br />THE ON-SITE PROCESSING WILL QONSIST OF WASHING AND SCREENING MATERIAL. <br />THE MUD WILL SETTLE OUP IN THE SETTLF;ING POND, ANU THE PRODUCT WILL <br />WILL BE TRANSPOAPEU BY TRUCK 'IC. 18061 TELLER COUN'PY HIGHWAY # 1, for <br />STOCK-PII,EING, AND RESALE. <br />EXHIBIT D AECLAMATICN PLAN <br />BECAUSE WE ARE DREDGING A LAKE, TI-(ERE IS NO OVERBOURDEN 1i~ BE REEP9DVED. <br />WE PLAN 'PO START DREDGING AT T!~ NORTH-EAST END OF THE LAKE, THEN <br />PROCEED IIv A SOUTHWESTERLY DIF2EGTION <br />SEE EXHIBIT E PAGE 11. <br />THE SHORELINE WILL HAVE A 5 TO 1 SLOPE ALL THE T+]AY AROUND T[{t LAKE. <br />THE DAM HPS A 4 TO 1 UPHILL SLOPE AND A 3 T'O 1 DOWNHILL SIfJPE. <br />THERE FTLLL BE 6 INCHES OF TOP SOIL Fid~M THE SHORELINE 'It7 THE ROAD <br />Aid~UND THE LAKE. THIS AREA WILL ALSO GET SEED, FERTELIZER, AND MULCH. <br />SEE EXHIBIT B PAGE 2 AND 3. <br />THE FOLLOWING SEERS WILL BE USED ON THE RECLAMATION PLAN. <br />MANHAR SMOOTH BROME, NORGON CRESTED WHEAT GRPSS AND LUNA PUBESCETdT WHEAT <br />GRASS . <br />SEE EXHIBIT B PPL;E 3. <br />Lid PREPERATICN FOR THE CAMPGI~UND WE NEED TO DREDGE 20,000 YARDS OF <br />SAND AND GRAVEL. PART OF WHICH WILL BE USED CN SITE, TO GRAVEL ROAC6, <br />PARKING AREAS AND 'IO MIX CEMENT. THE EXCESS MATEkTAT• WILL BE HAULED TO <br />18061 TELLER Q~UNTY 13DAD 9 1. FOR STUCI~ILING. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.